Need information about consumption of lines of code:
-
Scenario 1: If I scan a project with 300 lines of code and I scan this project with a lines of code 310. How much I am going to be charged ? Is it 310 lines of code or 300+310 = 610 lines of code ?
-
Scenario 2: I have branches in my project as master and other feature branches. In this master branch has 100 lines of code and the other feature branches have 110 lines of code in this case how many lines of code are charged ?
Please direct me to the right person this affecting our purchase and sales people redirected us to the support team.